                      Information Modeling (BIM) is a digital representation of
                      physical and functional characteristics of a facility (a
                      Digital Twin). Ideally, the BIM model is a shared
                      knowledge resource for information about a facility
                      forming a reliable basis for decisions during its
                      life-cycle accessed, and developed by the various design
                      professionals involved in the facility, contractors,
                      subcontractors and suppliers constructing the facility,
                      and the owners and operators during the life of the
                      facility through to its demolition (or re-purposing).
Building
                      Information Modeling (BIM) is a digital representation of
                      physical and functional characteristics of a facility (a
                      Digital Twin). Ideally, the BIM model is a shared
                      knowledge resource for information about a facility
                      forming a reliable basis for decisions during its
                      life-cycle accessed, and developed by the various design
                      professionals involved in the facility, contractors,
                      subcontractors and suppliers constructing the facility,
                      and the owners and operators during the life of the
                      facility through to its demolition (or re-purposing).
                       
BIM is an expansive methodology that extends far beyond
                      any single software: 
                      - True BIM is about collaboration and data sharing across
                      the entire project lifecycle. It's a holistic approach to
                      information management that goes beyond individual tools.
                      It's about leveraging technology to enhance collaboration,
                      efficiency, and project outcomes. 
                      - BIM isn't just 3D modeling; it's about data-rich models
                      that inform decision-making. It encompasses aspects like
                      project management, cost estimation, and facility
                      management.
                      - BIM thrives on interoperability. The ability of
                      different software tools to communicate seamlessly is what
                      empowers a BIM project. It's about breaking down silos.
As BIM developes, it has the capability to be an
                      intelligent model-based process that gives architecture,
                      engineering, and construction (AEC) professionals the
                      insight and tools they need to more efficiently plan,
                      design, construct, and manage buildings and
                      infrastructure. 
                          
WP: BIM = Building Information Modelling. BIM is a game changing evolution in the way the ‘built environment’ is designed, built and maintained through life to the eventual decommissioning and either renovation or demolition of the structure. this White Paper offers a concise overview of the technology.
In 2024, there are seven generally agreed dimensions:

                    
Additional levels of BIM are being considered and are available in some software tools at this time there is only general views on how the dimensions may be standardized:
8D BIM: Safety and/or Risk Analysis
                      8D BIM adds risks, hazard, and/or safety information to
                      the geometric model to improve safety at work and prevent
                      accidents. With 8D BIM it is possible for the safety
                      manager to visualize the construction site before
                      construction, enabling an effective analysis of all
                      possible scenarios to prevent hazards and other issues. 
9D BIM : Waste Management and/or Lean Construction
                      
                      9D BIM, is the dimension of BIM that optimizes and
                      streamlines all the steps involved in the implementation
                      of a project through processes digitization to minimize
                      waste. Lean construction is an approach that enables
                      efficient management of resources and involves monitoring
                      the use of raw materials in order to minimize the
                      incidence of waste. 
10D BIM: Industrialized Construction 
                      10D BIM aims to make the construction sector more
                      productive through the integration of new technologies and
                      physical, commercial, environmental or other type of data
                      to optimize each phase and increased construction quality.
                      Next-generation digital infrastructure offers accurate
                      control at every stage of production of each individual
                      element through advanced, codified and standardized
                      processes.
 
                    
This suite of international standards encompasses concepts and principles (ISO 19650-1), asset delivery phase (ISO 19650-2), asset operational phase (ISO 19650-3), information exchange (ISO 19650-4) and security (ISO 19650-5). Together the documents outline the concepts and principles for information management at a stage of maturity described as 'building information modelling (BIM)' and provides recommendations for a framework to manage information including exchanging, recording, versioning and organizing for all actors. These documents are applicable to the whole life cycle of any built asset, including strategic planning, initial design, engineering, development, documentation and construction, day-to-day operation, maintenance, refurbishment, repair and end-of-life.
                    
Art: BIM in Australia. Australia desperately needs effective leadership from the Federal Government, supported by the States and Territories to reap the benefits and savings achieved by a coordinated implementation of BIM. This article offers a brief overview of the situation as at May 2022.
DP: Government Procurement A Sovereign Security Imperative. Report of the Australian government, March 2022. Recommendation 7 'digital by default' focuses on the use of BIM.
UK BIM implementation map. The Roadmap is owned by BSI committee B555 Construction design, modelling and data exchange, which brings together leading institutions and organizations around the BIM agenda to support the delivery of clear guidance to the UK industry dedicated to providing and operating built assets.
Prs: Projects controls using integrated data. This presentation outlines the future of project controls as an integrated part of an overall project information system using remote sensing, virtual reality and other emerging technologies.
Assemble - A web-based 3D solution that lets you extract meta data, add coding, collaborate, and connect. Part of Autodesk Construction Solutions: https://assemblesystems.com/
Bentley - 4D constructon platform including SYNCHRO:
                      https://www.bentley.com/ 
                      
             
                      -  iTwin Products facilitate the development
                      and use of 'digital twins'. 
                                   
                      -  ProjectWise, powered by iTwin, provides a
                      data centric workflows enabling advanced civil 
                                       
                      validations.
                                   
                      -  Bentley Infrastructure Cloud delivers
                      improved insights, decisions, and outcomes for 
                                       
                      your infrastructure projects and assets. 
                    
BIM 360 - A unified construction management software platform connecting your project teams and data in real-time, from design through construction. Part of Autodesk Construction Solutions: https://www.autodesk.com/bim-360/
iConstruct - A building information modeling (BIM) software for Autodesk Navisworks: https://iconstruct.com
Navisworks® - Project review software, holistically review integrated models and data to better control project outcomes: https://www.autodesk.eu/products/navisworks/overview
Revit - Tools for architectural design, MEP and structural design, detailing and engineering, and construction professionals. Contributors across all disciplines use worksharing and Autodesk BIM 360 to share and save work to the same project: https://www.autodesk.com.au/products/revit/overview
RIB - 5D BIM Enterprise Construction Cloud
                      incorporating project lifecycle management, enterprise
                      digitization, BI and AI: https://ribccs.com/oceania/  
                      Full RIB listing on our
                        construction management page.
UniPhi - Integrated SaaS 5D BIM software to collaborate, track and report on your projects and portfolio: http://uniphi.com.au/
For a list of tools focused on managing the construction process visit our planning and controls, software page.
Australasian BIM Advisory Board (ABAB). Providing a coordinated approach to development of BIM practices, standards, and requirements in Australia: https://www.abab.net.au/
Australian National BIM Portal. Maintained by NATSPEC//Construction Information, all content is accessible free of charge: https://bim.natspec.org/
The Chartered Institute of Building (CIOB). the world's largest and most influential professional body for construction management and leadership: https://www.ciob.org/about
Constructing Excellence - CE (UK) aims to achieve a step change in construction productivity by tackling the market failures and promoting continuous improvement: http://www.constructingexcellence.org.uk
EU BIM Handbook - Click to Download.
ICPMA - The International Construction Project Management Association (ICPMA) is an international umbrella association focusing on international Knowledge Management, the General Annual Meeting, working groups and publications: http://www.icpma.net
World Commerce & Contracting (formally IACCM) world-class standards in contracting and relationship management process and skills: https://www.worldcc.com/ Publishes the IACCM Capability Maturity Model to benchmark contracting processes: https://www.worldcc.com/Research/Capability-Maturity-Analysis-Benchmark