                          Easy EVM Workbook is a simple spreadsheet that
                      performs the calculations needed to apply EVM to normal
                      projects. It is recommended for use on straightforward
                      engineering projects up to $20 million and ICT projects up
                      to $10 million, both with a pragmatic work package design,
                      for more on this see: Sizing Work Packages. 
                      
The worksheet is designed to process the data for a
                      single update. After each update is complete, you save a
                      copy of the spreadsheet ready for the next update and then
                      edit / add the new information at the appropriate time.
                      The worksheet is protected to maintain its integrity, data
                      can only be entered in the cells shaded light green and
                      there are extensive error checks built in to validate the
                      information. Trend information is valuable, reviewing
                      changes in a work package over several updates (saved
                      worksheets) will indicate if the project situation is
                      improving or deteriorating. 
                       
Work package numbers and descriptions are free-form and can be edited to suit the needs of the project to a maximum of 35 work packages. Once created, these should not be changed.
It is recommended a schedule be set up for the project
                      with the following characteristics: 
                      1. The schedule contains a summary activity for each work
                      package with detail tasks below 
                      2. The summary activity be set up to roll up 'physical
                      percent complete' from the underlying detail activities 
                      3. Dates and percent complete are transcribed into the
                      workbook from the schedule. 
Baseline start and end dates are obtained from the initial schedule and transcribed into the relevant fields, and baseline budget values are obtained from the project budget. Once entered these values should not be changed. The total budget (BAC) is summed at the top of the table for verification against the project finances.
Then at each update, the actual schedule and cost information is obtained from the same sources and transferred into the spreadsheet for an instant update to the EVM information.
Detail instructions on the use of the spreadsheet are
                      included on the second 'Instructions' tab and we are happy
                      to provide help or advice. 
					  or download
                        the instructions for use
                       
Buy the Easy EVM Workbook for $20 (plus
                      GST for Australian purchasers only)    Buy Now     Link to download emailed on
                      completion of purchase.
                       
Easy EVM Workbook is designed to support the practical approach to implementing earned value management described in Easy EVM. Buy the book and spreadsheet as a bundle for $40, saving $15: